|
|
| |
 |
|
Alabama
State
Port
Authority
FY 2007 |
 |
Dedicated:
1928 |
 |
Acreage:
Total -
4,000 |
|
|
Main
Complex:
570
McDuffie
Island:
556
Choctaw
Point:
380+/-
acres
Other
Sites:
2,098
Inland
Docks:
462 |
 |
Number
of
Berths:
37 |
 |
Channel
Depth:
45 Feet
to the
Tunnels;
40 Foot
in the
River
Harbor |
 |
4
Million
sq. ft.
of
warehousing
and open
yards. |
 |
Number
of
vessel
calls:
ASPA
859;
Portwide:
1,295 |
 |
Revenue
Producing
Rail Car
Movements:
111,782 |
 |
2007
ASPA
Tonnage:
26.9
Million
Tons |
 |
2007
ASPA
Containers:
108,572 TEUs |
 |
2006
ASPA
Containers:
68,823
TEUs |
 |
2005
ASPA
Containers:
42,443
TEUs |
 |
2004
ASPA
Containers:
37,375
TEUs |
 |
2003
ASPA
Containers:
23,960
TEUs |
 |
ASPA
2007
Revenue:
$109.7 Million |
|
 |
Imports:
Containers Coal,
Aluminum, Iron, Steel,
Copper, Lumber,
Woodpulp, Plywood,
Fence
Posts, Veneers, Roll and
Cut Paper, Cement, and
Chemicals. |
|
 |
Exports:
Containers Coal, Lumber,
Plywood, Woodpulp, OSB,
Laminate, Flooring,
Roll and Cut Paper,
Iron, Steel, Frozen
Poultry, Soybeans, and
Chemicals. |
|
|
ALABAMA STATE
PORT AUTHORITY
FACILITIES |
|
|
McDuffie
Coal Terminal: |
|
 |
Total
Tonnage
for FY
'07:
18.02
Million |
|
 |
Size:
Largest
Import
Terminal
in the Nation |
|
 |
Second
Largest
in
Nation |
|
 |
Ground
Capacity:
2.3
Million
Tons |
|
 |
Annual
Throughput
Capacity:
22
Million
Tons |
|
 |
Berths:
3;
Shiploaders:
1;
Ship
Unloaders:
3 |
|
 |
Rail
Dumps:
1
Tandem;
1 Single |
|
 |
Stacker/Reclaimers:
4;
Double
Stacker:
2 |
|
 |
Barge
Unloaders:
2;
Barge
Loader:
3 |
|
 |
Automatic
Samplers:
2 |
|
 |
|
|
|
|
Bulk
Material
Handling Plant: |
|
 |
Tonnage
FY '07:
3.0
Million |
|
 |
Ground
Storage
Capacity:
400,000
Tons |
|
 |
Covered
Storage
Capacity:
100,000
Tons |
|
 |
Major
commodities:
Import
Coal |
|
 |
Berths:
2;
Barge
Loader:
1 |
|
 |
Ship
Loader:
1
Air
Draft 49
feet @
mean low
tide.
Boom
extends
70 feet
from
face of
dock.
Travel
limit is
800
feet. |
|
 |
Tower
Unloaders:
2
(F
& H
Towers)
75 feet
to water
@ mean
low
tide.
Maximum
beam of
ship
that can
be
worked
over
side is
72 feet. |
|
 |
Length
of Pier:
1,564
feet;
Depth
alongside
Pier:
40 feet |
|
 |
Maximum
size
vessel
without
approval
from
Harbormaster:
850 feet
X 120
feet |
|
 |
Conveyor
sizes:
|
|
|
|
"A" Belt
|
48" |
#7 Belt
|
36" |
Loader
|
42" |
|
#1
|
42" |
#8
|
42" |
Stacker
|
48" |
|
#1
Shuttle
|
42" |
#9
|
42" |
"F"
Scale
|
60" |
|
#2
|
42" |
#11
|
42" |
"H"
Scale
|
60" |
|
#4
|
54" |
B-1
|
36" |
ALCOA
Belts
|
42" |
|
#5
|
42" |
B-2
|
36" |
|
|
|
#6
|
42" |
|
|
|
|
|
 |
Click
here
for more
information.
|
|
 |
|
|
|
|
General
Cargo/Intermodal: |
|
 |
Tonnage
FY '07:
3.38
Million |
|
 |
Export
%:
49;
Import
%:
51 |
|
 |
Berths:
28; Rail
Ferry
Terminal,
21-acre
Container
Yard,
Freezer Terminal,
RO/RO
Ramp |
|
 |
Major
Commodities:
Containers,
Woodpulp,
Iron &
Steel,
Aluminum,
Copper,
Lumber, Linerboard
&
Paper,
Frozen
Poultry |
|
 |
|
|
|
|
Terminal
Railway: |
|
 |
111,782
Revenue-Producing
Moves in
FY2007 |
|
 |
Eight
Locomotives |
|
 |
247
Freight
Cars |
|
 |
75 Miles
of Track |
|
 |
|
|
|
|
Theodore
Terminals: |
|
Mobile Middle
Bay Port: |
|
 |
200
acres
|
|
 |
600-Foot
Finger
Pier |
|
 |
36-Foot
Draft |
| |
|
Marine Liquid
Bulk Terminal: |
|
 |
Tonnage
FY '07:
1.2
Million
|
|
 |
1,100-Foot
Pier |
|
 |
40-Foot
Depth at
Ship
(east)
Berth |
|
 |
12-Foot
Depth at
Barge
(west)
Berth |
| |
|
 |
 |
|
|
|
|
Inland Docks: |
|
Bridgeport |
14
acres |
Eufaula |
13
acres |
|
Claiborne |
54
acres |
Montgomery |
32
acres |
|
Columbia |
59
acres |
Phenix
City |
110
acres |
|
Cordova |
60
acres |
Selma |
37
acres |
|
Demopolis |
16
acres |
Tuscaloosa-Northport |
68
acres |
|
Axis |
5
acres |
|
|
|
|
|
|
|
For more
information,
please
contact:
|
|
|
Judith
Adams,
Manager Media
Relations &
Economic
Development
Phone:
251-441-7003 Fax:
251-441-7216
Email:
jadams@asdd.com
|
|
| |
| |
| |
| |
|
|
|