1. 22-acre lighted container/ open berth
2. Pier 2, open berth (900 ft.)
3. Pier 3, 30 x 500-ft.; 200 x 500-ft. transit shed
4. Pier 4, 30 x 500-ft.; 200 x 500-ft. transit shed
5. International Trade Center/Alabama State Port
Authority Headquarters
6. Pier 5, 30 x 500-ft.; 100,000-sq.-ft. container
& breakbulk operations
7. Pier 6, 30 x 500-ft.; 200 x 500-ft. transit shed
8. Pier 7, 30 x 670-ft.; 200 x 500-ft. transit shed
9. RO/RO berth; 97-ft. traffic area at stern,
580-ft. shipside dock
10. Pier 8, 30 x 580-ft.; 200 x 500-ft. transit shed
11. Unit 19 warehouse, 37,000 sq. ft.
12. Pier 2 Container Interchange Gate
13. Berth 8 warehouse, 68,000 sq. ft.
14. Pier A South, 70 x 570-ft.; 120,000 sq. ft.
blast freezer/refrigerated storage terminal
15. A-18 warehouse, 69,000 sq. ft.
16. Center A warehouse, 50,000 sq. ft.
17. Pier A North, 1508-ft.; three berths; 205,500-sq.-ft.warehouse; 85,000-sq.-ft. open storage
18. ASPA Administration Building
19. Pier B South, 102 x 1530-ft.; three berths;
149,600 sq. ft. warehouse; 100-ft.-wide loading apron; dual covered rail
20. Pier B River End, 32 x 650-ft.; 18,000 sq. ft.
open storage
21. Pier B North, 76 x 1600-ft., three berths;
274,500-sq.-ft. transit shed, triple-covered rail tracks
22. Pier C South, 80 x 1530-ft., two berths;
410,000-sq.-ft. transit shed; dual-covered rail tracks |
23. Pier C River End, 70 x 810-ft.;
62,700 sq. ft. open storage
24. Pier C North, 174 x 1400-ft., three berths;
steel & heavy-lift area; 244,840-sq.-ft. open storage.
25. Grain elevator, 800-ft. pier
26. Cement terminal
27. Pig iron dock, 79 x 640-ft.
28. Pier D, 800-ft. wharf, 116 x 410-ft. warehouse
on north side of grain elevator
29. Pier D-2, 48 x 500-ft.; 15-acre open storage area
30. Pier E, 1100-ft. berth, twin warehouses,
126,900 sq. ft. each; 47,000-sq.-ft. open storage
31. CG Railway ferry terminal, 130 x 400-ft. cut slip
32. Bulk Material Handling Plant, 1540-ft. pier,
two berths; shipside open storage
33. Dry bulk covered warehouses (three warehouses),193,600 sq. ft.
34. Bulk material west storage yard
35. Truck Control Terminal. Directions: From I-10, exit north onto Water Street. Turn right on Beauregard Street and follow signs. From I-165, exit south onto Water Street. Turn left on Beauregard Street and follow signs.
36. Blakeley Terminal; 153,000-sq.-ft. warehouse; 500-ft. pier
37. Rail system serving Alabama State Port Authority
38. McDuffie Terminal; 3065-ft. of berth
(three berths); dredged to 45 feet
39. Mobile Container Terminal; 2000-ft. of berth
at 45-ft. depth
40. Choctaw Point Complex; intermodal rail and Logistics Park; on-terminal road connection to Mobile Container Terminal; access to 5 Class I railroads |